Data center

Data Center Engineering

Built for the
Edge of
Infrastructure

EDS architects high-performance data centers — electrical, mechanical, and CSA — with uncompromising precision. Frankfurt-based. Globally deployed.

Who We Are

Precision Engineering
at Every Voltage Level

EDS specializes in architecting data centers for optimal performance, simplicity, and efficiency. Electrical, mechanical, and CSA disciplines — under one roof, delivered without compromise.

Learn more about EDS
On Time Every project delivered as promised
On Budget No surprises, no hidden costs
Zero Compromises on quality standards
Global Everyone, everywhere

Selected Projects

Projects That Deliver

Real engineering challenges. Solved with precision, on time, on budget.

Hyperscale data center
Electrical

Hyperscale Campus — 40 MW Power Design

Full MV/LV electrical design for a 3-building hyperscale campus. 2N UPS architecture, busbar trunking, 132kV substation. Delivered 6 weeks ahead of schedule.

Capacity

40 MW IT Load

Scope

Full Electrical

Colocation retrofit
Mechanical + CSA

Brownfield Colocation Retrofit — 8 MW Expansion

Mechanical and structural redesign of an existing colocation facility to add 8 MW of IT capacity. Live environment, zero downtime.

Capacity

8 MW

Scope

M + CSA

Engineering blueprints design to permit
Full Scope

Greenfield Edge Facility — Design to Permit

Complete electrical, mechanical and architectural design for a 2 MW edge data center from concept to building permit. 14 weeks concept to approved drawings.

Capacity

2 MW

Scope

E + M + CSA

What Clients Say

Trusted by Leading Operators

"EDS delivered construction-ready electrical drawings six weeks ahead of programme. The 132 kV coordination alone saved us weeks of contractor back-and-forth."

Head of Data Center Development

Leading DACH Hyperscaler

"We needed 8 MW of additional IT capacity with zero downtime for existing tenants. EDS phased the mechanical retrofit flawlessly — not a single SLA breach."

Technical Director

European Colocation Operator

"Concept to approved building permit in 14 weeks. Having electrical, mechanical and CSA under one team removed every coordination bottleneck we expected."

Infrastructure Lead

Global Financial Institution

Your project, next.

Tell us about your data center challenge — we'll be back within one business day.