ElectricalHyperscale Campus — 40 MW Power Design
Full MV/LV electrical design for a 3-building hyperscale campus. 2N UPS architecture, busbar trunking throughout, 132 kV substation interface and coordination with the DSO. EDS delivered complete construction-ready drawings 6 weeks ahead of the contractor programme.
IT Capacity
40 MW
Buildings
3
Delivered
6 wks early