Data center projects

Selected Projects

Projects That Deliver

A cross-section of EDS engineering work — from hyperscale campus design to edge facilities and live brownfield retrofits.

Hyperscale Campus — 40 MW Power Design
Electrical
Central Europe

Hyperscale Campus — 40 MW Power Design

Full MV/LV electrical design for a 3-building hyperscale campus. 2N UPS architecture, busbar trunking throughout, 132 kV substation interface and coordination with the DSO. EDS delivered complete construction-ready drawings 6 weeks ahead of the contractor programme.

MV Switchgear DesignLV Distribution2N UPS ArchitectureBusbar Trunking132 kV Substation InterfaceGenerator Plant

IT Capacity

40 MW

Buildings

3

Delivered

6 wks early

Brownfield Colocation Retrofit — 8 MW Expansion
Mechanical + CSA
Germany

Brownfield Colocation Retrofit — 8 MW Expansion

Mechanical and structural redesign of a live colocation facility to add 8 MW of IT capacity without interrupting existing tenants. Hot-aisle containment, CRAC-to-CRAH upgrade, raised floor modification, and new fire suppression integration — all executed in a phased programme.

Hot/Cold Aisle ContainmentCRAC ReplacementHVAC RedesignRaised Floor ModificationFire Suppression IntegrationPhased Delivery Plan

Added Capacity

8 MW

Downtime

Zero

Scope

M + CSA

Greenfield Edge Facility — Design to Permit
Full Scope
Western Europe

Greenfield Edge Facility — Design to Permit

Complete electrical, mechanical and architectural design for a 2 MW edge data center from concept to building permit submission. EDS delivered the full design package — including all engineering calculations, specifications and authority submissions — in 14 weeks.

Electrical E+M+CSAConcept DesignDetailed DesignAuthority SubmissionsFire StrategyStructural Calculations

IT Capacity

2 MW

Timeline

14 weeks

Scope

E + M + CSA

Carrier-Neutral Colocation — Power Infrastructure Upgrade
Electrical
DACH Region

Carrier-Neutral Colocation — Power Infrastructure Upgrade

Electrical infrastructure upgrade for a 12 MW carrier-neutral colocation operator looking to increase density and reliability. New N+1 transformer arrangement, resegmentation of LV distribution boards, and a full protection coordination study to meet Tier III requirements.

Transformer DesignProtection CoordinationLV ResegmentationTier III ComplianceLoad Flow AnalysisShort Circuit Studies

Facility Size

12 MW

Tier Level

III

Scope

Full Electrical

High-Density AI Cluster — Cooling Redesign
Mechanical
Netherlands

High-Density AI Cluster — Cooling Redesign

Thermal and mechanical redesign of an existing white space to accommodate a high-density AI compute cluster with average rack loads of 30+ kW. EDS developed a rear-door heat exchanger solution integrated with the existing chilled water plant, achieving PUE 1.2 without new CRACs.

Thermal ModellingRear-Door Heat ExchangersChilled Water IntegrationCFD AnalysisPUE OptimisationContainment Design

Rack Density

30+ kW

PUE Achieved

1.2

Scope

Mechanical

Financial Sector Private Data Center — Tier IV Design
Full Scope
Frankfurt

Financial Sector Private Data Center — Tier IV Design

Full engineering design for a private 5 MW Tier IV data center for a financial institution. Concurrent maintainability and fault tolerance at every level — 2N+1 UPS, dual independent cooling paths, separate fire compartments and full CSA compliance with local building authority. Strict confidentiality throughout.

Tier IV Architecture2N+1 UPS DesignDual Cooling PathsFire CompartmentationStructural DesignRegulatory Compliance

IT Capacity

5 MW

Tier Level

IV

Scope

E + M + CSA

Your project, next.

Tell us about your data center challenge — we'll be back within one business day.